BG视讯被要求检查布里斯托尔一所三卧室住宅现有的化粪池和可能正在衰竭的排水领域. The system was surveyed and found to be undersized and requiring replacement. 房子和场地都被美化得非常好,而替换现有的化粪池总是需要进行高度的景观处理,需要数十米的人工挖沟.

化粪池被一个考虑ASP 6人口工厂取代,在车棚下面有一个整体泵排放. 抽水的上升主水管是通过人工安装的,通过温室和观赏鱼池旁的花园,并以邻近围场的一个突破速度的人孔结束. There porosity tests undertaken showed that the wastewater could discharge into a drainage field in the paddock area.

Specification

The ASP 6 pe package sewage treatment plant was chosen for its complete below ground installation, reliability, quiet and odourless operation and low installation costs. The ASP plant is tested in accordance with the BS EN12566-3:2005 standard, British Water Code of Practice for Flows and Loads as well as being CE marked and the plant produces an effluent standard quality of better than 20mg/LBOD; 30mg/L SS; 20mg/L NH3.

The system was installed under an Environment Agency Exemption, under a Building Control Notice and electrically connected by a Part P certified electrician.

If you have any questions about the information presented in this case study, or you would like to talk to us about your off mains drainage options, please contact BG视讯 on 01984 623404 or via the contact form below.

Contact Us

Please complete the form and a member of the team will be in touch shortly

如果您有任何问题或只是需要一些澄清的规定和他们如何适用于您的财产, please call us on 01984 623404